Dold 0069520 RL9405/500 3/N AC80-230V 50Hz energy meter
|
360,52 EUR |
|||||||||||
|
( 429,02 EUR incl. VAT ) ≈ £302.12 | ≈ $395.85 plus delivery charges: 55,00 € |
|||||||||||
| On order · Delivery time approx. 20 workdaysinfo_outline | |||||||||||
| Datasheet: | file_download Download | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Lieske Part No.: | 1001004 | ||||||||||
| Mfg Part No: | 0069520 | ||||||||||
| UPC/EAN: | 4030641695200 | ||||||||||
| Weight: | 0.105 kg | ||||||||||
| Type: | RL9405/500 3/N AC80-230V 50Hz | ||||||||||
|
Graduated prices net
|
|||||||||||
Product information for Dold 0069520:
Applications
The energy meter RL9405/500 is designed for measurement in 3-phase networks with neutral conductor, regardless of whether it is an IT, TN, or TT system. It is suitable for monitoring energy consumption in industrial plants, production environments, building technology, or energy distribution in companies. Measurement is continuous, with voltages and currents sampled and evaluated in real time. The permanently stored energy measurement values remain in the device even after power supply is switched off, enabling subsequent evaluation.
Functions and Equipment in Detail
The device measures RMS and peak values of phase voltage and phase current, as well as network frequency, power factor, active power, reactive power, apparent power, active energy, reactive energy, and apparent energy. The measurement accuracy is ± 0.5 %, ensuring reliable data acquisition. Current measurement is performed via external current transformers, with the RL9405/500 specifically designed for current transformers with a secondary rated current of 5 A. The turns ratio of the current transformers can be set via the Modbus interface, enabling adaptation to market-standard transformers. The measurement ranges extend up to 1000 A when using external current transformers.
Technology Explained Simply
Energy is generated from the measurement voltage of all three phases, simplifying installation. The RS485 interface operates with the Modbus RTU protocol and is galvanically isolated to avoid interference and potential differences. The Modbus address can be set between 1 and 99, and the baud rate is selectable in values of 9600, 19200, and 38400. Display is via two LEDs: a green LED (ON) indicates that the operating voltage is present, and a yellow LED (BUS) signals bus activity.
Compatibility and Accessories
The RL9405/500 is designed for use with current transformers having a secondary rated current of 5 A. Adaptation to other transformers is achieved by setting the turns ratio via the Modbus interface. The interface enables communication with higher-level systems supporting Modbus RTU. Terminal markings include voltage input terminals (L1, L2, L3, N), current measurement inputs (i1, k1, i2, k2, i3, k3), and RS485 connections (GND, A, B).
Mounting and Installation
The device is installed in enclosures or installation small distributors. Mounting is done in standard 35 mm width, allowing direct mounting on DIN rails. The terminal connections are clearly labeled, with current measurement performed via external current transformers. Power supply is provided via the voltage input terminals, eliminating the need for an additional power source.
Advantages in Operation
The compact design with a 35 mm width frees up more space in the enclosure, facilitating installation in confined areas. Permanent storage of energy measurement values ensures data retention even after a power failure. Galvanic isolation of the Modbus interface increases interference resistance and safety. Simple adjustment of Modbus address and baud rate on the device facilitates integration into existing systems. The device is not certified as an electricity meter for active energy consumption in accordance with EU Directive 2004/22/EC (MID) and therefore must not be used for billing purposes.
| Technical data | |
| 1- / 3-phase | 3 |
| Auxiliary voltage | Without |
| Bus interface | Modbus RTU |
| Enclosure design | Distribution board |
| Measuring range max. | 230 V |
| Standard measuring range | 3/N AC 80 - 230 V |
| Width | 35 mm |
| Type | RL 9405 |
| Variant | |
| Nominal voltage | 3/N AC 80 - 230 V / 140 - 400 V 50 Hz |
| Variant | Secondary rated current of the current transformers 5 A |
Questions & answers
What is the delivery time of Dold 0069520 RL9405/500 3/N AC80-230V 50Hz energy meter?
The article Dold 0069520 RL9405/500 3/N AC80-230V 50Hz energy meter is currently not in stock but has been backordered.
According to our experience the article is ready for dispatch within 20 working days. The delivery time usually refers to 1 piece. When ordering larger quantities, we can maybe shorten the delivery time. Just send us an inquiry about the desired quantity of Dold 0069520 to our sales team for an exact delivery time.
How can I buy the item at a lower price?
We offer you Dold 0069520 RL9405/500 3/N AC80-230V 50Hz energy meter always at the best possible price. We can give you a discount of 2% on Dold 0069520 RL9405/500 3/N AC80-230V 50Hz energy meter if you choose payment in advance on ordering.
In addition, you can save money with our attractive graduated prizes with every purchase. If you buy a minimum of 4 pieces of Dold 0069520 RL9405/500 3/N AC80-230V 50Hz energy meter we can offer you a price of 344,30 EUR per piece. The more you buy, the cheaper the article will be.
We also offer individual prices for your needs. You can get an offer by using the form Wholesale Inquiry.