Online retailer for industrial customers, commercial customers and public institutions - no sales to private customers
Switch to german languageIndustry-Electronics in English
Schneider Electric Logo

Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant

Your rating:
Average rating
product review for Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant
( 4.4 / 5 ) 49 ratings
Schneider Electric A9MEM3110
This image may differ from the desired article.
224,50 EUR 234,26 EUR
( 267,16 EUR incl. VAT )
≈ £189.70  |  ≈ $250.99
plus delivery charges: 53,00 €
Made to order · Delivery time approx. 20 workdaysinfo_outline
1x Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant
Datasheet:file_download Download
Lieske Part No.:524232
Mfg Part No: A9MEM3110
UPC/EAN: 3606480481499
Weight:0.434 kg
Type:A9MEM3110

Product information for Schneider Electric A9MEM3110:

The iEM3110 energy meter is an attractive offering for a three-phase DIN rail mounted energy meter with LCD display. Additional local signaling includes a green LED power-on indicator, a flashing yellow LED for accuracy check and communication indicators. This meter can be used in billing and partial billing applications. The meter offers the following accuracy classes: Active Energy: Class 1 according to IEC 62053-21, Active Energy: Class B according to EN 50470-3 and Active Energy: Class 1 according to IEC 61557-12. The meter measures active and reactive power, active and reactive energy. Designed for 50Hz or 60Hz networks, the supply voltage can vary from 100 to 277VAC or 173 to 480VAC. The rated current of this meter is up to 63A for direct connection and supports single phase and neutral, three phase and three phase and neutral configurations. No primary communication ports. There is a digital pulse output for energy sensing. Certifications include EAC, CE, UL and MID. Product dimensions are as follows: width 90mm, depth 69mm, height 95mm and product weight 260g.


Product data sheet
Datasheet for Schneider Electric A9MEM3110, EAN: 3606480481499

Questions & answers

What is the delivery time of Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant?

The article Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant is currently not in stock and must be ordered on a per-order basis.

According to our experience the article is ready for dispatch within 20 working days. The delivery time usually refers to 1 piece. When ordering larger quantities, we can maybe shorten the delivery time. Just send us an inquiry about the desired quantity of Schneider Electric A9MEM3110 to our sales team for an exact delivery time.

How can I buy the item at a lower price?

We offer you Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant always at the best possible price. We can give you a discount of 2% on Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant if you choose payment in advance on ordering.

We also offer individual prices for your needs. You can get an offer by using the form Wholesale Inquiry.

 


Searching
Search is performed.
Please be patient ...
Fehlende Felder
Close
Product in the shopcart

The following item has been put into your shopping cart by our system:

1x Schneider Electric A9MEM3110 energy meter 3-phase 63A
Schneider Electric A9MEM3110 energy meter 3-phase 63 A with sub-meter S0-pulse MID-compliant
224,50 EUR
Sum of all articles in cart
plus VAT
You can continue shopping and open your cart at any time from the top menu bar or now directly by clicking the button.
Enquiry: Schneider Electric A9MEM3110 energy meter 3-phase 63A
Company name
Name
Homepage
Street
ZIP-Code City
Country
Telephone
Desired quantity
Comment
4 + 7 =
Data protection notice: The data entered here will only be electronically stored and processed for the purpose of responding to your inquiry in accordance with Art. 6 GDPR para. 1b. The basis for this is our privacy policy.
Name and email address are the only mandatory fields.

We use cookies. Some are required to run the shop (e.g. shopping cart and login), others help us improve it (Google Analytics). Statistics cookies are only used with your consent. See our privacy policy for details.