Siemens 5TE5804, EAN: 4001869209913

Siemens 5TE5804 indicator light 230 V red

Installation > Modular devices / equipment installation > Modular devices, switches, buttons, etc.

Siemens 5TE5804 indicator light 230 V red

Lieske Part No. 347167
Mfg Part No 5TE5804
EAN-Code 4001869209913
Manufacturer Siemens
Here only 31,05 EUR
36,95 EUR incl. VAT

Further information for Siemens 5TE5804 indicator light 230 V red

Indicator light 1x LED, 230V red for long supply cable Switching devices for DIN rail mounting for controlling electrical systems. The switching devices for DIN rail mounting from Siemens as an important part of the SENTRON components for electrical installation are used in control cabinets and distributors for switching small loads on, off and changing over. Whether with remote or manual switching, latching or push-button function, for infrastructure or industrial requirements - Siemens offers switching devices for all applications and every area of use. Convenient assembly and connection technology, uniform accessories and a consistent design - these are the hallmarks of the device family. The switching devices from Siemens are characterized above all by: 1. Extensive applications for switching and pressing small loads. 2. A wide variety of uniform accessories that are easy to install and can be replaced at any time. 3. Space-saving and simple DIN rail mounting. 4. Combination with remote switch possible. 5. Reliable safety during installation thanks to the reach-around and touch protection included as standard. 6. Optimum technology for your safety - only from Siemens.
This is an offer of:

Lieske Elektronik e.K.

Reutener Str. 10
79279 Vörstetten

https://industry-electronics.com
Tel. 07666/88499-0
Fax. 07666/88499-111

Diesen Artikel finden Sie unter:
industry-electronics.com/artikel/347167
qrcode für Siemens 5TE5804 indicator light 230 V red