Further information for PRIO Primo transition grommet C40 - P955-40-NK
The end and transition sleeve C40 leads M40 pipes further and fixes them in a way that is absolutely concrete-tight and safely relieves strain. The nail and adhesive base can be firmly connected to other sleeves and bends using the plug-in system. In the in-situ concrete, the nail and adhesive base is nailed to the formwork. In the precast concrete plant, it is glued to the formwork table. Thanks to optional wings (P761), the bend can also be attached directly to the steel reinforcement. The transitions are also available in sizes M20, M25 and M32.