| Technical data |
| Age | Child years |
| Type | Basic Set |
The Intelino expansion set INT-J1-SS1-21 is an accessory package for the Intelino MINT train, specifically developed to extend the play and programming environment of the Smart Train Starter Set. It enables the expansion of the track layout and increases the number of interactive Action Snaps, allowing for more complex railway setups and gameplay sequences. The expansion allows for flexible design of railway layouts through additional track pieces and color-coded stones used to control trains and trigger actions.
Expansion of track infrastructure
The set includes a total of 20 track pieces, divided into 4 straight sections, 4 switches, and 12 curves. These components allow the creation of more complex track routes, including branches and curves, which are necessary for diverse gameplay. The tracks are modular and can be easily connected to existing layouts from the Starter Set, thereby extending the overall track length. The switches enable control of train direction, allowing for dynamic gameplay sequences.
Action Snaps and color-coded stones
In addition to the track pieces, the set contains 40 color-coded stones that function as Action Snaps. These stones are placed on the tracks and allow specific actions to be triggered through programming or manual control, such as stopping, accelerating, or executing special functions on the train. The color coding serves as visual guidance and enables easy assignment of stones to specific commands or functions within the gameplay sequence.
Compatibility and integration
The expansion set is specifically designed for the Intelino MINT train and is compatible with the Smart Train Starter Set. It can be directly connected to existing track layouts without requiring additional adapters or converters. The stones and tracks are designed to integrate seamlessly into the existing system without impairing train functionality. The expansion is intended solely for enlarging the layout and increasing interactive elements, without requiring additional electronic components or software updates.
Use in educational and play contexts
The set is designed for use in educational and playful contexts, particularly for children who wish to become familiar with basic programming, logic, and technology. The combination of physical tracks and digital control elements promotes spatial thinking, planning skills, and understanding of simple algorithms. The color-coded stones support the development of causal reasoning, as children learn that specific actions are triggered by specific stones.
Functions and equipment in detail
The 20 track pieces are made of robust, child-friendly materials suitable for home and educational use. The straight and curved sections are standard lengths to ensure easy assembly and connection. The switches allow trains to be rerouted at crossings or branches, increasing gameplay variety. The 40 color-coded stones are small, easy to handle, and can be placed at any point on the tracks to trigger actions. The stones are not equipped with batteries or electronic components, serving purely as mechanical and visual control elements.
Assembly and installation
Assembly is done by simply connecting the track pieces together. Connections are made via magnetic or mechanical locking mechanisms, ensuring stable fixation. The color-coded stones are placed directly on the tracks, with positioning varying according to the desired action. No special tools or additional mounting aids are required. Installation requires no electrical connections or software configuration, as the stones and tracks operate passively and control is managed through the existing Intelino system.
The expansion significantly enhances play and learning opportunities by doubling the number of tracks and interactive elements. The combination of physical tracks and digital control elements provides an interactive learning environment that promotes spatial thinking, logic, and basic programming skills. The set is easy to assemble and requires no additional components or software updates to function with the existing system.